Operation and modernization of HPP, CHPP, GRES equipment
Dates - from June 21 to June 25; from October 25 to October 29
№ |
Section names |
Watch |
||
Total |
Lectures |
Practice |
||
|
Turbines of hydraulic power plants |
4 |
4 |
|
|
Hydroelectric dams |
2 |
2 |
- |
|
Russian-made hydraulic turbines |
4 |
4 |
- |
|
Hydraulic turbines of leading foreign manufacturers |
4 |
4 |
- |
|
Optimal use of water resources |
4 |
4 |
- |
|
Operation, repair and adjustment of HPP equipment |
2 |
2 |
- |
|
Features of operation of heat and power plants (CHP) |
2 |
2 |
- |
|
Protection of equipment from earthquakes |
2 |
2 |
- |
|
Operation and modernization of electrical equipment for own needs (SN) of CHPP |
2 |
2 |
- |
|
Frequency of repair and increase of the inter-repair period of the electrical equipment of the CH CHPP |
2 |
2 |
- |
|
Classes at work |
8 |
- |
8 |
|
TOTAL |
36 |
28 |
8 |