1.1. Emergency automation
of electrical distribution networks
Dates - from April 12 to April 16
№ |
Section names |
Watch |
||
Total |
Lectures |
Practice |
||
1 |
Synchronization and adjustment of cabinets |
4 |
4 |
|
2 |
Installation of terminals |
2 |
2 |
- |
3 |
Connecting to the existing secondary circuits of the current transformer and the voltage transformer |
4 |
4 |
- |
4 |
PA devices with the function of automatic elimination of asynchronous mode (ALAR) |
2 |
2 |
- |
5 |
Linear PA functions. Checking the functions of the linear PA. |
4 |
4 |
- |
6 |
Functions for unloading and disconnecting consumers |
4 |
4 |
- |
7 |
Connecting to RZiA terminals |
4 |
4 |
- |
8 |
Synchronization of the PA operation with RZiA devices |
4 |
4 |
- |
9 |
Classes at work |
8 |
- |
8 |
|
TOTAL |
36 |
28 |
8 |