1.1. Operation of high voltage lines
Dates - from February 15 to February 26; from November 15 to November 26
№ |
Section names |
Watch |
||
Total |
Lectures |
Practice |
||
1 |
Reliability and emergency situations in the electric power industry |
8 |
8 |
- |
2 |
Improving the reliability of overhead lines. Operating status of the overhead line. Methods of control and technical diagnostics of overhead line elements. |
12 |
12 |
- |
New designs of overhead line elements. Supports, foundations, wires, spiral type fittings. |
12 |
12 |
- |
|
4 |
Testing of overhead line elements. Defects of overhead line elements and methods of their repair. |
12 |
12 |
- |
5 |
Problems of overhead line mechanics, climatic conditions, loads and impacts. Methods of combating ice vibration and dancing wires on the overhead line. |
12 |
12 |
- |
6 |
Methods of maintenance of overhead lines. Protection of metal structures from corrosion. Chemical clearing of trails from tree and shrub vegetation. |
8 |
8 |
- |
7 |
The use of personal computers in the calculation of operating modes of electrical networks |
8 |
- |
8 |
|
TOTAL |
72 |
64 |
8 |