Organization of work of the boiler shop of GRES and CHPP
Dates - from May 31 to June 04; from August 30 to September 03
№ |
Section names |
Watch |
||
Total |
Lectures |
Practice |
||
1 |
Serviceability and reliability of operation |
2 |
2 |
|
2 |
Ensuring proper operation of the equipment |
4 |
4 |
- |
3 |
Immediate solutions in emergency situations |
2 |
2 |
- |
4 |
Output power based on the load schedule |
2 |
2 |
- |
5 |
The process of generating electricity at GRES and CHPP |
8 |
|
(8) |
6 |
Monitoring of compliance with the requirements of the internal labor regulations |
2 |
2 |
- |
7 |
Monitoring compliance with TB requirements |
2 |
2 |
- |
8 |
Measuring instrument readings and permissible deviations |
4 |
4 |
- |
9 |
Emergency situations in the boiler room |
2 |
2 |
- |
10 |
Classes in production (CHPP-1 Almaty) |
8 |
- |
8 |
|
TOTAL |
36 |
20 |
16 |