1.1. Organization of work of the electric shop of GRES and CHPP
Dates - from April 12 to April 16; from December 13 to December 17
№ |
Section names |
Watch |
||
Total |
Lectures |
Practice |
||
|
Control of electrical equipment repair |
4 |
4 |
|
|
Carrying out commissioning works |
4 |
4 |
- |
|
Operation of electrical equipment of the power plant |
4 |
4 |
- |
|
Maintenance of electrical equipment |
4 |
4 |
- |
|
Dismantling of damaged equipment and replacing it with a new one |
4 |
4 |
- |
|
Quality control of installation and disassembly |
4 |
4 |
- |
|
Installation control |
4 |
4 |
- |
|
Classes in production (CHPP-1 Almaty) |
8 |
|
8 |
|
TOTAL |
36 |
28 |
8 |